Why an EvoMetal hall
A steel building goes up far faster than concrete or masonry: the frame is prepared in series, delivered to site and erected in about 2 weeks. Costs stay predictable and the interior stays completely open.
- Columns and trusses designed individually for every project
- High-strength bolted connections – no welding
- Clear spans up to 30 m, no interior columns
- 120-micron paint and galvanized C and Z purlins for walls and roof
- PIR sandwich panels for superior thermal insulation
- Technical design for building permits



