Hall dimensions
Area, eaves height and span determine the amount of steel. Per square metre a large hall is usually more efficient than a small one, because some costs are spread over more area.
Design loads
Snow, wind and operating loads (racking, machinery, overhead crane) change the profile sections. That is why the structure is calculated individually for each project.
Cladding and insulation
The thickness of PIR sandwich panels and the number of doors and windows significantly affect the final cost. A heated hall needs more insulation than a cold store.
Foundation and floor
The reinforced-concrete foundation is calculated for the chosen structure and the soil on site. The industrial floor depends on the traffic and loads it will carry.
Location and deadlines
Transport distance, site access and the required deadlines can influence the offer. We deliver nationwide and deadlines are fixed in the contract.
How to get an exact offer
Prepare the desired dimensions, purpose, location and, if you have it, a site plan. Call or message us on WhatsApp – we answer directly and prepare a personalised offer.
